• Shayne Consultants Pvt. Ltd.
  • Shayne Consultants Pvt. Ltd.
  • Shayne Consultants Pvt. Ltd.
  • Shayne Consultants Pvt. Ltd.
  • Shayne Consultants Pvt. Ltd.

Completed Projects

  • Construction of Bridge near Gandhi Kutir on 8 feet wide road across Kankra Khadi in Surat
  • Design and Construction of Conventional STP of 22.5 MLD Capacity including development of plot and pipe line work at Ankleshwar.
  • Laying of 700 mm DICL Pipe from Dindoli water Reserviior to the industries of Sachin GIDC at Surat.
  • Construction of Fly Over Bridge at Parle Point Junction on Surat Dumas Road at Surat.
  • Construction of Auro University at Bhatpore GIDC Hazira at Surat.
  • Construction of 2 - Lane Railway Over Bridge across Ahmedabad - Mumbai Broad Gauge Line at Railway km. 395/10 between station Vadodara and Makarpura near Dinesh Mill at Vadodara.
  • Construction of 4 - Lane Railway Over Bridge Ahmedabad - Mumbai Broad Gauge Line at Railway km. 395/41 between station Vishwamitri and Makarpura near D-Cabin in Nava Yard on 24 meter Road at Vadodara.
  • Construction of Commercial Showroom for Audi Car near Rundhnath Mahadev Temple Surat.
  • Construction of Railway Over Bridge across Pratapnagar - Jambusar Broad Gauge Line at Lal Baug at Vadodara.
  • Construction of Rigid Pavements on the roads of Surat city.
  • Construction and Widening of bridge on Vishwamitri river near Urmi school at Sama at Vadodara.
  • Construction of Fly Over Bridge on 40 meter wide ring road at Amitnagar junction, Vadodara.
  • Construction of ROB across Ahmedabad-Mumbai B.G. Railway line at Railway Culvert no, 440/A near Anjana S.T.P at Surat.
  • Construction of Approaches for the Railway Over Bridge across Vadodara-Dabhoi B.G. Railway line at Rly. Km.05/0-1 in Lieu of Rly. Crossing No. 4between station Pratapnagar and Dabhoi on 40.0M wide Ring Road excluding Railway Portion at SOMA Talav Vadodara.
  • Construction of ROB across Vishwamitri - Jambusar N.G. Railway Line at Railway Km. 2/3-4 on 40.0 meter Ring Road near Kalali at Vadodara.
  • Construction of Railway Over Bridge across Bhestan - Bhusaval Loop line at LC No. 2 at Dindoli Main Road, Surat.
  • Construction of the Railway Over Bridge across Ahmedabad - Mumbai B.G. Railway line at Railway. 394/10-12 between station Vishwamitri and Vadodara including Bridge Across Vishwamitri River 40.0 M Wide Road connecting Akota-Dandiya Bazar Excluding Railway Portion at Vadodara.
  • Construction of Fly Over Bridge and surfacing of 40 meter wide road connecting Akota-Dandiya bazaar, Vadodara.
  • Construction of 2x2 split Fly Over Bridge at Vishwakarma Junction - Middle Ring Road at Surat (BRTS) Phase - II, Surat.
  • Construction of 2x2 split Fly Over Bridge at Sitanagar cross roads at Surat (BRTS).
  • Construction of Bridge across Vishwamitri river on Manjalpur - Atladra 36.0 meter wide road at Atladra, Vadodara.
  • Construction of ROB across Surat - Bhusaval Main line in lieu of LC No. 3C Joining Godadara & Dindoli in Surat.
  • Construction of new roads with asphalting at Hazira Notified area in Surat.